XDP Remanufactured AE Fuel Injector for Ford (1999.5-03) 7.3L Power Stroke (#8 Long Lead)
XD475
XDP Remanufactured AE Fuel Injector for Ford 7.3L Power Stroke (#8 Long Lead)
The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Power Stroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
Features:
•Stock HP and Flow Rating
•Best In Class End-Of-Line Testing Nozzles
•Tested For Flow, Leakage and Needle Lift
•In-Line Error Proofing Incorporated In Assembly Process
The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Power Stroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.
Features:
•Stock HP and Flow Rating
•Best In Class End-Of-Line Testing Nozzles
•Tested For Flow, Leakage and Needle Lift
•In-Line Error Proofing Incorporated In Assembly Process
Was:
$176.35
Sale:
$163.84
Save:
7%
Save:
$12.51
Description
By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.
Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.
Core Details:
• A $500 core charge will be added to your shopping cart unless you elect to send your cores in first.
• If you select sending cores in first, we will not process your order until your cores have arrived. There will be a 5% cancellation fee if you decide to cancel your order before it is shipped.
• If you select to NOT send cores in first (pay the core charge) your order will be processed right away and you can send your core to receive a refund for the core amount. Cores must be received within 60 days of when your product was shipped. After 60 days there will be a late fee of 10% per month deducted from the core value.
Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.
Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.
Core Details:
• A $500 core charge will be added to your shopping cart unless you elect to send your cores in first.
• If you select sending cores in first, we will not process your order until your cores have arrived. There will be a 5% cancellation fee if you decide to cancel your order before it is shipped.
• If you select to NOT send cores in first (pay the core charge) your order will be processed right away and you can send your core to receive a refund for the core amount. Cores must be received within 60 days of when your product was shipped. After 60 days there will be a late fee of 10% per month deducted from the core value.
Details
Shipping Information
- Item Requires Shipping
- 3.0 lbs.
- W4.3000” x H3.3000” x L10.7000”
- Free Shipping
Customer Reviews
Total Reviews (0)
You must login to post a review.

Write the First Review!