Click on image to zoom

Industrial Injection AE Reman Long Lead Injector for Ford/Nav (1999.5-02) 7.3L Power Stroke, Stock (#8 Long Lead)

AEPS
Industrial Injection AE Reman Long Lead Injector for Ford/Nav 7.3L Power Stroke, Stock (#8 Long Lead)
Was: $190.99
Sale: $157.10
Save: 18%
Save: $33.89

Core Charge: $100.00 Return first
Qty:
Free Shipping

Description

Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector

Our Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.

Fitment Notes: 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)

-Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.

Details

Categories

Shipping Information

  • Item Requires Shipping
  • 4.0 lbs.
  • W5.0000” x H3.0000” x L10.0000”
  • Free Shipping

Customer Reviews

Comment Total Reviews (0)

Write the First Review!

You must login to post a review.